About 1,600 switches costing UAH 75 million are needed to reconnect cable lines in Poltava Oblast, but only 25 have been approved so far, said Governor Vitalii Diakivnych.
About 1,600 switches costing UAH 75 million are needed to reconnect cable lines in Poltava Oblast, but only 25 have been approved so far, said Governor Vitalii Diakivnych.